From 1 - 10 / 44
  • Measures for protection against flooding

  • Delimitation of agglomerations

  • The hydromorphological status was determined by a monitoring compliant with the Water Framework Directive (Directive 2000/60/EU). The elaboration of a structural quality mapping is one part of this monitoring. Within the scope of the work on the structural quality mapping, a total of 31 parameters in the area of the river bed, the river bank and the floodplain are assessed so that the structural quality mapping contains detailed information on the river morphology and the river continuity. In this case, the evaluation of the mapped sections is based on seven classes. The areas river bed, left river bank, right riverbank, left floodplain and right floodplain are represented in 5 strips.

  • Risk assessment of the groundwater body regarding the failure of the good state in 2021.

  • Nature Parks

  • LEADER Areas

  • This layer contains the infrared version of the orthophoto 2013.

  • In 2017, the ACT has executed a prototype project of a LIDAR flight in preparation of a country wide flight in 2018/2019. One of the results of this prototype is a high resolution digital height model. Date of the overflight: 9 april 2017

  • The chemical status of the surface water bodies is assessed as being good or failing to achieve good chemical status. The assessment of the chemical status for the second river basin management plan is based on the list of substances of directive 2008/105/EC and the environmental quality standards established by the new directive 2013/39/EC.

  • Regional Tourist Offices